3D Synchronization plan

Speaking of 3D heritage, we produce high quality BIM models of future buildings which allows us to have 3D interpretation of everything in every moment, resulting with 3D synchronization plan at last.

There are no clashes between MEP parts (plumbing, sewage pipes, spinkler, HVAC) mutually or between MEP part and building construction, in our projects. General contractor and Supervision shell use our detail design literally, because all the problems from the site are already previously solved at our project documentation.

The walking path is chosen by the user in real-time, using the IPad, other tablet device, laptop or PC. This approach is superior at the site while the building is constructed. In a click user can review MEP elements, details, reinforcement or holes in slabs/walls.”